Skip to main content

HomeMaestro Engine Assembly Part 2

Preview · you are not signed in

Machine Shop and Preliminary Work

The Maestro’s 356 Engine Assembly · Part 2 of 5

The engine from Part 1 goes to the machine shop. Harry weighs and reads the connecting rods, grinds the flywheel, ports the heads and gives them a three-angle valve job, then fits the rods to the reground crank. The first bearing he pulls tells him the crank has been ground before: “I was hoping for a standard crank.” Below the video is his walkthrough in his own words, in 13 steps.

Harry’s walkthrough

1. Making a rod stand from the flywheel

Watch this step from 0:11

Before I pull a single rod, I turn the flywheel into a stand, down on the ground, not on the engine stand. The trick is the dowel pins. Two sit closer together than the rest, leaving one wide gap and one short. I find that close pair on the flywheel, the matching close pair on the crank, and mate them.

Then I tip it up, run the flywheel nut I just took off back onto the crank, and snug it by hand. Now the crank is securely attached and makes a very nice stand to take the rods off.

The rule  The flywheel bolts to the crankshaft in only one rotational position. Two dowel pins sit closer together than the rest, and they must line up with the matching close-spaced pair on the crank.

The rest of this page is for members

Registry members get Harry’s full walkthrough beside the video, in his own words, with a timestamp for every step.

Sign in or join the club

The series

Source. The method, the judgments and the voice on this page are Harry Pellow’s (HCP Research), from The Maestro’s 356 Engine Assembly, Part 2. Published with the permission of Andrew Pellow.

External links and resources on this page point to sites the 356 Registry does not control. They may change or go offline, and the Registry does not endorse their content.


Last updated November 16, 2026

← The Maestro’s Engine Videos   ·   Part 3: Lower End Assembly →



Facebook Page Icon Instagram Page Icon